Water is the most persistent force on any construction site. TerraTek installs and maintains the erosion and sediment controls that keep a permitted Texas site compliant from first disturbance, and builds the drainage structures and channels that manage stormwater for the life of the development. We work for general contractors, developers, and energy teams on commercial and energy projects only. In the raw-land-to-build-ready sequence, this scope runs the full length of the job: controls go in before clearing, are maintained through grading and utilities, and the site hands over with permanent drainage in place. Our crews execute to the SWPPP; the plan itself is the owner's consultant's work — a division that keeps compliance clean.

Based in San Angelo, TXServing all of TexasSequenced with our own crewsCommercial & energy projects only

Why Erosion & Drainage Control Sets Up Everything That Follows

Texas rain does not arrive politely. Across much of the state — and especially in West Texas — storms drop inches in an hour on ground that sheds water rather than absorbing it. Expansive clays seal when wet and shed runoff in concentrated sheets; caliche country carries flow into draws and arroyos that run hard and fast. A disturbed site with no controls in place does two expensive things in that first storm: it loses the soil the grading plan depends on, and it sends sediment offsite, which is a permit violation with enforcement teeth. Compliance on a permitted site starts at first disturbance, not at final stabilization.

The cheapest drainage fix is the one made before grading starts. Controls installed ahead of disturbance keep a site workable through weather that shuts down unprepared projects — a graded site that drains reopens days sooner than one that ponds. And the construction-phase system is only half the scope: the channels, swales, culverts, and basins on the civil plans are permanent infrastructure that inspectors walk before acceptance. Because TerraTek's crews run the grading and the controls together, drainage is built into the phasing plan rather than chasing it — perimeter controls first, disturbed areas managed in stages, permanent structures built as their grades become available. One contractor holding the connected scopes means the water plan actually connects, from the first silt fence to the last stabilized slope.

What Our Erosion & Drainage Scope Includes

Construction-phase sediment controls

Silt fence, inlet protection, stabilized construction entrances, check dams, and the perimeter controls a permitted site must have in place before disturbance begins. Installation follows the SWPPP's control drawings, and the work does not end at installation: controls are maintained, repaired after storm events, and adjusted as construction phases move disturbance around the site. When areas reach final stabilization, temporary controls are removed and the ground they occupied is restored.

Channels, swales & graded drainage paths

Open channels and swales cut and shaped to the lines, grades, and cross-sections on the civil plans — lined or unlined as the design directs. Grade control matters as much here as in a sewer trench: a swale built flat holds water against the very areas it was designed to protect. Channel work is coordinated with mass grading so drainage paths are established as the site takes its finished shape, not carved in afterward.

Culverts, outfalls & energy dissipation

Cross-drainage culverts, headwalls, safety end treatments, and outfall structures built where concentrated flow enters and leaves the site. At outfalls, energy dissipation — rip-rap aprons, rock protection, stilling areas — is placed to the details in the plans so discharge does not scour the channel it enters. On energy sites and long access corridors, culvert work is sequenced with road construction so crossings go in before traffic needs them.

Detention & sediment basins

Basins that serve double duty: many detention ponds are built early to function as sediment basins during construction, then cleaned, shaped to final section, and converted to their permanent role at project close-out. We build embankments, control structures, and emergency spillways to the civil design, with the earthwork discipline basin performance depends on. Full pond scope — detention, retention, and stock ponds — is covered under pond construction.

Slope protection & final stabilization

Cut and fill slopes protected with erosion control blankets, turf reinforcement matting, and rock protection where the design calls for it, plus the seedbed preparation that gives permanent vegetation a chance to establish. Final stabilization is what closes out a construction permit, so this work is planned from the start rather than left to the end. On constrained sites where slopes cannot hold the grade change, the answer is often a retaining wall instead.

How It Connects to the Rest of the Civil Package

Erosion and drainage control touches nearly every other civil scope because water touches everything. It phases directly with earthwork — controls move as grading moves, and permanent drainage takes shape as final grades arrive. Buried storm systems installed under our underground utilities scope surface at the inlets and outfalls this scope protects. Detention and sediment basins hand off to pond construction, and culverts and roadside drainage phase with road construction so access stays open in wet weather. On steep or constrained ground, slope work coordinates with retaining walls. For a single contract that carries the water plan from first silt fence to final stabilization alongside every other civil scope, see turnkey site development.

Erosion & Drainage Control FAQ

Do we really need controls in place before clearing starts?

On a permitted site, yes — and the permit is explicit about it. Construction stormwater permits require designated controls to be installed before land disturbance begins, and the first inspection after a storm event will document whether they were. Beyond compliance, the practical case is just as strong: the first storm on a cleared, unprotected site erodes the material your grading plan counted on and deposits it where it must be excavated again. Perimeter controls and a stabilized entrance are among the least expensive items on a civil site and among the most expensive to have skipped. We install them as the first order of work, before the first tree comes down.

What is the difference between construction-phase controls and permanent drainage?

Construction-phase controls — silt fence, inlet protection, check dams, sediment basins — are temporary measures that manage runoff while the site is disturbed; they are maintained through construction and removed once ground is stabilized. Permanent drainage — channels, culverts, storm structures, detention — is infrastructure on the civil plans that serves the development for its life. The two systems overlap in time and often in space: a detention pond may spend construction working as a sediment basin, and a permanent channel may carry construction runoff long before it carries its design storm. Building both with one contractor keeps the temporary system from damaging the permanent one, and vice versa.

Who writes the SWPPP, and who inspects compliance?

The stormwater pollution prevention plan and the permit documents are prepared by the owner's engineer or environmental consultant — not by the contractor installing the controls. Compliance inspections follow the permit's requirements: routine inspections and post-storm inspections, documented, with deficiencies corrected on a defined clock. TerraTek's role is field execution — installing the controls the SWPPP shows, maintaining and repairing them through construction, and removing them at stabilization — plus building the permanent drainage on the civil plans. That division of responsibility is deliberate: the party who wrote the plan verifies it, and the party building the site executes it.

Can TerraTek take erosion and drainage as a standalone scope?

Yes. General contractors regularly carry SWPPP installation and maintenance as its own line item, and we price it that way — installation, storm-event maintenance, and removal at stabilization, with the permanent drainage structures priced from the civil sheets. The scope gets stronger when it is bundled: when the same contractor holds grading and controls, phasing conflicts disappear, disturbed acreage is managed deliberately, and drainage structures are built as their grades arrive instead of after the fact. Both models work; the difference is how many seams your schedule has to manage. The bundled version lives under turnkey site development.

How do we get this scope priced?

Send the drainage sheets, the SWPPP or its control drawings if they exist yet, and the grading plan — the three documents this scope lives between. Use our contact page and include location, disturbed acreage if you know it, and the construction schedule the controls will have to live through. We respond with a scope breakdown that separates construction-phase controls, maintenance, and permanent drainage structures, states what is excluded, and flags anything in the water plan that looks like it will fight the phasing. If the SWPPP is still being written, we can price from the civil sheets and true up when it issues.

Scope & Responsibility

Stormwater pollution prevention plans (SWPPPs) and permit documents are prepared by the owner's engineer or environmental consultant, and compliance inspections follow the permit's requirements. TerraTek's role is field execution: installing, maintaining, and removing erosion and sediment controls per the SWPPP, and building the drainage improvements shown on the civil plans.

Get the Water Plan Right

Send the drainage sheets or SWPPP and we will respond with how the controls and permanent drainage should be phased, maintained, and built. The first storm is coming either way.